I'm still getting a few comments that I can't reply to
but I do see them! So, to answer to a couple questions:
My Pumpkin Patch quilt is from the pattern
Hocus Pocus by The Pattern Basket.
Pine Tree Lane is from Peppermint Pines
by EricaMade and can be found here.
Okay, time to check in on last week's progress.
"Slow and steady as she goes" is the theme!
A little here and a little there adds up!
1) Snowflake quilt: Cut everything out
Done!
I'm still waiting on two green fabrics to arrive
but everything else is done.
I can go ahead and check this off. There are other
issues to note for this quilt so if you are considering
this please see my post from yesterday:
2) HST's: keep going
Done.
Finished sewing another set. Only one left.
3) Knitting: work on scarf
Done.
I'm creeping along but at least I'm creeping.
4) Think on contest entry & get required fat quarter
Done.
I wasn't sure which fabric my stash would match
best so I grabbed both. (Maybe I'll make two?)
either so I'll likely have to make another LQS run.
For the actual quilt, I have narrowed it down to
three options. More on this project next week.
5) Finish blog housekeeping
Done.
The pages are up to date at least. I want to
get them cleaned up and all projects linked to
their respective posts but a person could spend
all day doing this stuff. I'd rather sew. This will
just be an on-going thing from here on out.
At least everything is there.
Bonus!
Another squirrel sneaked in.
It's supposed to be 12X12--mine is 12X13.
Not sure what happened but I like it that way.
I'm trying to do more minis so this, along with the
other 3 Valentine's projects, has me achieving that
goal fantastically early. I've mailed this one off to my
aunt/Godmother as a surprise. Why send a card
when we've got skillz?
Fabric tracking
(purchased v used)
YTD:
Balance forward: + 24 / -1.25
This week: +1 / -9
Total: +25 / -10.25
I did better this week--now to keep improving!
The week ahead looks a little busy so I'm
keeping it light.
1) Snowflake quilt: Make 2 blocks
2) Charity quilt contest: finalize quilt(s);
start getting fabrics lined up.
3) Make a simple fabric tracking spreadsheet
One month in and I already hate the math.
'Nuff said.
Best wishes for a productive week to all!
Happy quilting!
Happy quilting!
Linking up to:
Home Sewn By Us Tuesday To Do #78
Home Sewn By Us Tuesday To Do #78
Comments